Riverton Cemetery '00- Early Construction

So much work, so little time.


Click on the Thumbnails to see the full size picture.

dcp_0031.jpg
Our first on-site meeting
dcp_0032.jpg
The beginnings of the Crypt Scene
dcp_0036.jpg
What you do when you run out of room
dcp_0037.jpg
Last years walls ready to go for this year
dcp_0038.jpg
Brittany and Brenna Long take a break
from all their hard work
dcp_0039.jpg
The entrance to the house will slowly disappear
dcp_0040.jpg
The Monk Scene
dcp_0041.jpg
This years ramps are safer than stairs and ADA compliant
dcp_0147.jpg
The Crypt is getting a matching facade
dcp_0046.jpg
The Chapel being designed
dcp_0047.jpg
Rick Holbrook, Jon Mickelson, and Bob Joslin plan projection angles
dcp_0048.jpg
The break area is now out of the way
dcp_0050.jpg
Leah Osbourne works while Ryan Wirthlin is hardly working
dcp_0052.jpg
Rick Holbrook briefs on the Load-In schedule
dcp_0055.jpg
Crypt taking shape
dcp_0109.jpg
Going over what we want vs. what's available in costumes
dcp_0112.jpg
Chuck Beckman, stands precariously above, with the hammer in one hand, and holding on with the other, Ryan Wirthlin and Jeff Long are amazed
dcp_0113.jpg
Jeff Long stands at the entrance to the Crypt
dcp_0117.jpg
The electrical crew starts to allocate electrity and make runs
dcp_0119.jpg
Measure twice and cut once!
dcp_0120.jpg
Further along on the Chapel
dcp_0125.jpg
Jonathan Mickelson- ever the demented mind at work
dcp_0130.jpg
Vanessa Androus adds detail to a Crypt column
dcp_0133.jpg
The backside of the Chapel
dcp_0138.jpg
Glen Coffman turns a garage into a Mineshaft
dcp_0139.jpg
The Chapel looks like a chapel!
dcp_0141.jpg
First looks at the Crematorium
dcp_0145.jpg
The Crypt gets a ramp and doors

Home